A pre-demolition survey is an essential step in any demolition project. By conducting a thorough assessment of the building or structure, potential hazards can be identified and appropriate measures can be taken to ensure a safe and efficient demolition process. The cost of a pre-demolition survey may vary, but it is a worthwhile investment in the overall success and safety of the project.

Pre-demolition survey overview

Learn about the importance of conducting a pre-demolition survey before starting a demolition project. Find out what a pre-demolition survey entails, including visual inspection, sampling and testing, structural assessment, services identification, and documentation.

Discover the costs associated with pre-demolition surveys and why they are a necessary investment for ensuring safety and minimizing risks in the demolition process.

Before any demolition project can commence, it is crucial to conduct a pre-demolition survey.

This survey serves as a comprehensive assessment of the building or structure to be demolished, ensuring that all necessary precautions are taken and potential risks are identified and mitigated.

In this article, we will delve into the details of what a pre-demolition survey entails and provide insights into the associated costs.

What is a Pre-demolition survey - TOTAL Demolition

A pre-demolition survey, also known as a pre-demolition assessment or a pre-demolition inspection, is a systematic evaluation of a building or structure prior to its demolition. The primary objective of this survey is to identify and assess any potential hazards that may be present, such as asbestos-containing materials, hazardous substances, or structural weaknesses.

A pre-demolition survey encompasses various elements to provide a comprehensive understanding of the building’s condition. The specific scope may vary depending on the size, complexity, and nature of the structure, but generally includes the following:

  • Visual Inspection: The surveyor visually inspects the entire building, including its internal and external components. This examination helps identify any visible signs of damage, deterioration, or potential hazards.
  • Sampling and Testing: If there is a suspicion of asbestos-containing materials (ACMs) or other hazardous substances, the surveyor may collect samples for laboratory analysis. This testing ensures accurate identification and appropriate handling of any hazardous materials.
  • Structural Assessment: The surveyor evaluates the structural integrity of the building, looking for signs of weakness, instability, or potential collapse. This assessment helps determine the safest demolition methods and necessary precautions.
  • Services Identification: The surveyor identifies and records the location of various services, such as gas, water, electricity, and telecommunications, to ensure their safe disconnection or relocation during the demolition process.
  • Documentation: The surveyor prepares a detailed report documenting their findings, including photographs, test results, and recommendations for safe demolition practices. This report serves as a valuable reference for contractors and other stakeholders involved in the demolition project.

The cost of a pre-demolition survey can vary depending on several factors, including the size and complexity of the building, the location, and the specific requirements of the project. Typically, the cost is calculated on a per-square-meter basis or as a fixed fee.

On average, the cost of a pre-demolition survey can range from £500 to £5,000. However, it is important to note that this estimate is indicative and can vary significantly based on the aforementioned factors.

While the cost of a pre-demolition survey may seem like an additional expense, it is a necessary investment to ensure the safety of the demolition process. Identifying and addressing potential hazards beforehand can prevent accidents, protect workers’ health, and minimize environmental risks.

A pre-demolition survey serves multiple purposes and offers several benefits. Let’s take a closer look at some of the key reasons why you need to conduct this survey:

1. Identify Hazardous Materials

One of the primary objectives of a pre-demolition survey is to identify hazardous materials present in the structure. These materials may include asbestos, lead-based paint, PCBs, or other harmful substances. Identifying and safely removing these materials before demolition is essential to protect the health and safety of workers and the surrounding environment.

2. Assess Structural Stability

A thorough inspection of the building’s structure during a pre-demolition survey helps assess its stability. This evaluation ensures that the demolition process can be carried out safely without causing any unexpected collapses or accidents. Identifying weak points or areas of concern allows for appropriate planning and precautions to be taken.

3. Determine the Scope of Demolition

By conducting a pre-demolition survey, you can accurately determine the scope of the demolition project. This includes identifying which parts of the structure need to be demolished and which can be salvaged or repurposed. Understanding the extent of the demolition work helps in estimating costs, allocating resources, and developing a clear project plan.

4. Compliance with Regulations

Many jurisdictions and regulatory bodies require a pre-demolition survey to ensure compliance with safety and environmental regulations. By conducting this survey, you demonstrate your commitment to following the necessary guidelines and protecting both the workers and the community.

The duration of a pre-demolition survey can vary depending on several factors, including the size and complexity of the structure, the presence of hazardous materials, and the thoroughness of the survey. On average, a pre-demolition survey can take anywhere from a few days to several weeks to complete.

The initial phase of the survey involves gathering information about the building, including architectural plans, construction materials used, and any historical records. This data collection process may take a few days or weeks, depending on the availability of the information.

Once the data collection is complete, the surveyors will physically inspect the structure, looking for hazardous materials and assessing its stability. This on-site inspection can take several days, especially for larger or more complex buildings.

After the on-site inspection, the surveyors will analyze the collected data, prepare a detailed report, and provide recommendations for the demolition process. The report may include information on hazardous materials removal, structural modifications, and any necessary permits or licenses. This analysis and report preparation phase can take a few days to a couple of weeks.

It is important to note that rushing through a pre-demolition survey can lead to incomplete or inaccurate results, which can have serious consequences during the demolition process. Therefore, it is advisable to allocate sufficient time for a thorough survey to ensure the safety and success of the demolition project.

Types of Demolition Surveys

There are two main types of demolition surveys commonly conducted in the UK: the pre-demolition survey and the pre-refurbishment survey.

1. Pre-Demolition Survey

A pre-demolition survey, also known as a Type 3 survey, is carried out before any demolition work begins. It involves a thorough inspection of the building or structure to identify and assess the presence of any hazardous materials, such as asbestos, lead, or other harmful substances.

The survey is conducted by a qualified and experienced surveyor who will inspect all accessible areas of the building, including ceilings, walls, floors, and other potential hiding places for hazardous materials. Samples may be taken and analyzed in a laboratory to determine the presence and concentration of asbestos or other hazardous substances.

Once the survey is completed, a comprehensive report is generated, detailing the findings and recommendations for safe demolition. The report serves as a crucial document for the demolition contractor, providing them with essential information to plan and carry out the demolition work safely.

2. Pre-Refurbishment Survey

A pre-refurbishment survey, also known as a Type 2 survey, is conducted when a building or structure is undergoing refurbishment or renovation. It aims to identify and assess any hazardous materials that may be disturbed or exposed during the refurbishment process.

The survey is similar to a pre-demolition survey in terms of methodology and scope. It involves a thorough inspection of the building, focusing on areas that will be affected by the refurbishment work. The surveyor will identify any hazardous materials present and provide recommendations for their safe removal or management.

The pre-refurbishment survey is essential to protect the health and safety of workers involved in the refurbishment process. It ensures that any hazardous materials are properly managed or removed before the work begins, reducing the risk of exposure and potential harm.

Demolition surveys, especially pre-demolition surveys, are not only important but also a legal requirement in the UK. According to the Control of Asbestos Regulations 2012, a pre-demolition survey is mandatory for all buildings built before the year 2000.

The importance of demolition surveys can be summarized as follows:

1. Identification of Hazardous Materials

Demolition surveys help identify the presence and location of hazardous materials, such as asbestos, lead, or other harmful substances. This information is crucial for the safe removal and disposal of these materials.

2. Risk Assessment

By identifying potential hazards, demolition surveys allow for a thorough risk assessment. This assessment helps in developing appropriate strategies and measures to mitigate risks and ensure the safety of workers, the public, and the environment.

3. Compliance with Legal Requirements

As mentioned earlier, a pre-demolition survey is a legal requirement in the UK for buildings constructed before 2000. Compliance with these regulations ensures that the demolition process is carried out safely and in accordance with the law.

4. Cost and Time Efficiency

By identifying potential hazards and risks before the demolition or refurbishment work begins, demolition surveys help in planning and implementing appropriate measures. This reduces the likelihood of unexpected delays and additional costs associated with the discovery of hazardous materials during the demolition process.

Demolition surveys play a crucial role in ensuring the safety and efficiency of demolition and refurbishment projects in the UK. By identifying and assessing potential hazards, these surveys help protect the health and well-being of workers and the public. Compliance with legal requirements regarding demolition surveys is essential to ensure that the process is carried out safely and in accordance with the law.

A pre-demolition survey is an essential step in any demolition project. It helps identify hazardous materials, assess structural stability, determine the scope of demolition, and ensure compliance with regulations. While the duration of a pre-demolition survey can vary, it is crucial to allocate sufficient time to conduct a thorough assessment. By investing in a comprehensive pre-demolition survey, you can mitigate risks, protect workers and the environment, and ensure a successful demolition process.

Asbestos in Homes

All you need to know about asbestos in homes in the United Kingdom. Current UK legislation does not make any legal requirements of domestic homeowners.

Asbestos Surveys

We are able to provide any level of survey required, up to the Demolition and Refurbishment survey now required prior to the demolition of any building or structure.

What is a Pre-Demolition Survey

When a building is to be demolished the (non-domestic) client ( usually the property owner) has a duty to provide pre-demolition information to the designer

Refurbishment Survey

A refurbishment survey / demolition survey is needed before any planned refurbishment or demolition work is carried out. This type of survey is used to locate and describe, as far as reasonable practicable

Asbestos Removal

Total Group perform safe and comprehensive asbestos removal work nationwide and have worked on some of the largest asbestos removal projects ever undertaken in the United Kingdom. 

Types of Asbestos

Asbestos has been included in many materials in the last 150 years.  Three common types of asbestos can be found in buildings: Crocidolite (Blue Asbestos), Amosite (Brown Asbestos), Chrysotile (White Asbestos)

Managing Asbestos

The strategy of the HSE is to ensure that those involved in the repair, removal or disturbance of asbestos containing materials (ACMs), such as insulation coatings or insulation boards, are licensed & competent 

What is Asbestos ?

Asbestos was commonly used as a construction material in the UK between the 1950s and 1980s in particular. If your home was built between these years, chances are that you are living with Asbestos

Ready to start your project ?

Let's Work Together

Please complete the form below and someone from the Total team will be in touch.

One partner, endless solutions

Follow Us

© All rights reserved you must not copy any content on this website without the written consent of the Total Group

Scroll to Top